<?xml version="1.0" encoding="iso-8859-1"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
    <channel>
        <atom:link href="http://www.eadonconsulting.co.uk/rss.xml" rel="self" type="application/rss+xml" />
        <title>Eadon Consulting Ltd - Mechanical and Structural Engineering Design Consultants</title>
        <link>http://www.eadonconsulting.co.uk</link>
        <description>Eadon Consulting Ltd is an independent mechanical and structural engineering design consultancy based in Rotherham. From developing initial concepts to assistance during final commissioning, our multi-disciplined, flexible approach enables us to provide innovative and practical engineering solutions.</description>
        <language>en</language>
        <lastBuildDate>Tue, 11 Oct 2011 09:35:00 +0100</lastBuildDate>
        <copyright>Copyright 2008-11 Eadon Consulting Ltd</copyright>
        <category>News</category>
        <docs>http://www.rssboard.org/rss-specification</docs>
        <image>
            <url>http://www.eadonconsulting.co.uk/graphics/global/eadon_consulting_rss_logo.gif</url>
            <title>Eadon Consulting Ltd - Mechanical and Structural Engineering Design Consultants</title>
            <link>http://www.eadonconsulting.co.uk</link>
            <width>144</width>
            <height>43</height>
        </image>          
		
		<item>
            <title>New Appointment at Eadon Consulting</title>
            <link>http://www.eadonconsulting.co.uk/NewsNewAppointmentSL.aspx</link>
            <description>Sarah Lee joins Eadon from Halcrow Group Limited, where she was an assistant engineer in the nuclear section of the Power division.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsNewAppointmentSL.aspx</guid>
            <pubDate>Tue, 6 Sep 2011 16:30:00 +0100</pubDate>
        </item>
		
		<item>
            <title>Dover Ro-Ro bridge works extend life of berth</title>
            <link>http://www.eadonconsulting.co.uk/NewsDoverRoRo.aspx</link>
            <description>The aim of the project is to ensure that the Berth 3 roll-on roll-off (ro-ro) bridge can continue to provide reliable and safe service long into the future.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsDoverRoRo.aspx</guid>
            <pubDate>Thu, 9 Jun 2011 16:30:00 +0100</pubDate>
        </item>

		<item>
            <title>Eadon Consulting Achieve ISO9001 Certification</title>
            <link>http://www.eadonconsulting.co.uk/NewsEadonISO9001.aspx</link>
            <description>Eadon are pleased to announce that the final stage of their ISO 9001:2008 Quality Management Systems certification process is complete.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsEadonISO9001.aspx</guid>
            <pubDate>Tue, 10 May 2011 16:30:00 +0100</pubDate>
        </item>
		
		<item>
            <title>Eadon Consulting attend the Crown Estate UK Offshore Wind Supply Chain Event</title>
            <link>http://www.eadonconsulting.co.uk/NewsCrownEstateOffshoreWindSupplyChainEvent.aspx</link>
            <description>Last week saw Eadon Consulting attend the Crown Estate UK Offshore Wind Supply Chain Event at York Race Course. The timely event was held the day after offshore planning consent was granted for the EON Humber Gateway Round 2 wind farm.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsCrownEstateOffshoreWindSupplyChainEvent.aspx</guid>
            <pubDate>Fri, 18 Feb 2011 17:00:00 +0000</pubDate>
        </item>

		<item>
            <title>Eadon Consulting attends the 46th NIA Decommissioning and Radwaste Working Group</title>
            <link>http://www.eadonconsulting.co.uk/NewsNIADecommissioningRadwasteWorkingGroup.aspx</link>
            <description>Nuclear Decommissioning and Radioactive Waste management is a hot topic. The efficient and safe decommissioning of Nuclear facilities and the disposal of Nuclear waste is important not only to existing facilities, our ability to deal with these issues will have an impact on the successful planning for Nuclear new build.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsNIADecommissioningRadwasteWorkingGroup.aspx</guid>
            <pubDate>Wed, 16 Feb 2011 17:00:00 +0000</pubDate>
        </item>
				
		<item>
            <title>Eadon Consulting Attend Carbon Capture and Storage Conference</title>
            <link>http://www.eadonconsulting.co.uk/NewsCarbonCaptureStorageConference.aspx</link>
            <description>Carbon Capture and Storage technology is expected to contribute a significant proportion of the UK’s energy supply over the coming decades.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsCarbonCaptureStorageConference.aspx</guid>
            <pubDate>Thu, 10 Feb 2011 17:00:00 +0000</pubDate>
        </item>
			
			<item>
            <title>Älvsborg Bridge Gantry, Sweden</title>
            <link>http://www.eadonconsulting.co.uk/NewsAlvsborgBridgeGantry.aspx</link>
            <description>Following on from their recent success with Humber Bridge Gantries, Eadon Consulting have once again been employed as gantry designer by C Spencer Limited to design gantries for the Älvsborgsbron in Gothenburg.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsAlvsborgBridgeGantry.aspx</guid>
            <pubDate>Tue, 08 Feb 2011 16:15:00 +0000</pubDate>
        </item>
			
			<item>
            <title>Eadon awarded work at Bristol's Historic Floating Harbour</title>
            <link>http://www.eadonconsulting.co.uk/NewsNethamLock.aspx</link>
            <description>Eadon have designed new Ekki timber lock gates to replace those at Netham Lock on the Feeder Canal.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsNethamLock.aspx</guid>
            <pubDate>Thu, 20 Jan 2011 16:50:00 +0000</pubDate>
        </item>

			<item>
            <title>Killaloe Canal Flow Gates Update</title>
            <link>http://www.eadonconsulting.co.uk/NewsKillaloeCanalFlowGatesUpdate.aspx</link>
            <description>A significant milestone has been reached with the completion of the fabrication of the flow control gates and stop logs.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsKillaloeCanalFlowGatesUpdate.aspx</guid>
            <pubDate>Tue, 18 Jan 2011 17:50:00 +0000</pubDate>
        </item>

			<item>
            <title>New Year Sees Further Expansion for Eadon</title>
            <link>http://www.eadonconsulting.co.uk/NewsWilliamBirdsallAppointment.aspx</link>
            <description>Will joins Eadon from Babcock International Group, where he was a Mechanical Engineer within its nuclear division.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsWilliamBirdsallAppointment.aspx</guid>
            <pubDate>Tue, 04 Jan 2011 11:15:00 +0000</pubDate>
        </item>

		<item>
            <title>New Appointment at Eadon Consulting</title>
            <link>http://www.eadonconsulting.co.uk/NewsChristopherSimmAppointment.aspx</link>
            <description>Chris joins Eadon having spent the last 2 years working as a contract Senior Project Engineer for various independent design consultancies.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsChristopherSimmAppointment.aspx</guid>
            <pubDate>Wed, 17 Nov 2010 15:30:00 +0000</pubDate>
        </item>

			<item>
            <title>Riversdale Swing Bridge Update</title>
            <link>http://www.eadonconsulting.co.uk/NewsRiversdaleSwingBridgeUpdate.aspx</link>
            <description>The mechanical, electrical and hydraulic systems for the bridge are installed and have been commissioned.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsRiversdaleSwingBridgeUpdate.aspx</guid>
            <pubDate>Mon, 01 Nov 2010 11:15:00 +0000</pubDate>
        </item>
			
			<item>
            <title>Es Suki stop logs and grapple beam</title>
            <link>http://www.eadonconsulting.co.uk/NewsEsSukiStopLogsAndGrappleBeam.aspx</link>
            <description>Eadon have recently completed the detailed design and analysis of a series of stop logs and associated grapple beam for stop log removal for a pumping station in the Sudan. </description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsEsSukiStopLogsAndGrappleBeam.aspx</guid>
            <pubDate>Tue, 28 Oct 2010 18:00:00 +0100</pubDate>
        </item>
		
		<item>
            <title>Media City Swing Bridge Nears Completion</title>
            <link>http://www.eadonconsulting.co.uk/NewsMediaCityOct10.aspx</link>
            <description>The Media City bridge is nearing completion with the bridge now installed on top of the main pivot.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsMediaCityOct10.aspx</guid>
            <pubDate>Tue, 26 Oct 2010 18:00:00 +0100</pubDate>
        </item>   
		   
		    <item>
            <title>Design Work Begins On The Killaloe Canal Flow Gates</title>
            <link>http://www.eadonconsulting.co.uk/NewsKillaloeCanalFlowGates.aspx</link>
            <description>Eadon Consulting’s extensive experience of designing water way control structures is now being drawn upon by Waterways Ireland for their new Killaloe Canal flow gates projects.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsKillaloeCanalFlowGates.aspx</guid>
            <pubDate>Mon, 30 Aug 2010 16:20:00 +0100</pubDate>
        </item>
			<item>
            <title>Riversdale Swing Bridge Moves Closer To Completion</title>
            <link>http://www.eadonconsulting.co.uk/NewsRiversdaleSwingBridge.aspx</link>
            <description>The Riversdale Swing Bridge project has taken a step closer to completion. Some of the main mechanical pieces of equipment have been fabricated and are awaiting the application of the surface protection system.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsRiversdaleSwingBridge.aspx</guid>
            <pubDate>Thu, 19 Aug 2010 12:45:00 +0100</pubDate>
        </item>
			<item>
            <title>New Appointment Sees Further Expansion For Eadon</title>
            <link>http://www.eadonconsulting.co.uk/NewsNewAppointment.aspx</link>
            <description>Engineering design consultancy Eadon Consulting has announced the appointment of Ian Hylands as the company’s new senior engineer.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsNewAppointment.aspx</guid>
            <pubDate>Mon, 05 Jul 2010 12:15:00 +0100</pubDate>
        </item>
		   <item>
            <title>Eadon Continue Their Involvement on the Poole Harbour Bridge</title>
            <link>http://www.eadonconsulting.co.uk/NewsTwinSailsBridgePoole.aspx</link>
            <description>Eadon are pleased to confirm the recent news that HOCHTIEF UK have been successful with their tender for the construction of the Twin Sails Bridge, Poole, Dorset.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsTwinSailsBridgePoole.aspx</guid>
            <pubDate>Wed, 19 May 2010 15:35:00 +0100</pubDate>
        </item>
		  <item>
            <title>Carter House Swing Bridge Restores Access to Widnes Waterways</title>
            <link>http://www.eadonconsulting.co.uk/NewsCarterHouseSwingBridge.aspx</link>
            <description>The new swing bridge has opened up a stretch of the Sankey canal to boats for the first time in 40 years.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsCarterHouseSwingBridge.aspx</guid>
            <pubDate>Thu, 01 Apr 2010 23:59:00 +0100</pubDate>
        </item>
		   <item>
            <title>Humber Bridge Dehumidification Project Lift Off</title>
            <link>http://www.eadonconsulting.co.uk/NewsHumberBridgeProjectLiftOff.aspx</link>
            <description>The first of four gantries is installed and wrapping works begins for the Humber Bridge Main Cable Dehumidification Project.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsHumberBridgeProjectLiftOff.aspx</guid>
            <pubDate>Wed, 07 Apr 2010 13:30:00 +0100</pubDate>
        </item>		
		  <item>
            <title>Eadon Attend Offshore Wind Supply Chain Event</title>
            <link>http://www.eadonconsulting.co.uk/NewsOffshoreWindSupplyEvent.aspx</link>
            <description>As part of Eadon’s ongoing commitment to support all areas of power generation, members of Eadon’s staff attended the Offshore Wind Supply Chain Event 2010.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsOffshoreWindSupplyEvent.aspx</guid>
            <pubDate>Fri, 26 Mar 2010 17:50:00 +0000</pubDate>
        </item>		
		  <item>
            <title>Forth Road Bridge Dropped Object Canopy Erection</title>
            <link>http://www.eadonconsulting.co.uk/ProjectForthBridgeDroppedObjectCanopy.aspx</link>
            <description>The contract to re-erect the Dropped Object Canopy on the Forth Road Bridge North Tower has recently been successfully completed by C Spencer Ltd, assisted by Eadon Consulting providing the temporary works design on the project.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/ProjectForthBridgeDroppedObjectCanopy.aspx</guid>
            <pubDate>Thu, 11 Mar 2010 17:30:00 +0000</pubDate>
        </item>		
		  <item>
            <title>Eadon To Design Gantries For Humber Bridge Dehumidification</title>
            <link>http://www.eadonconsulting.co.uk/NewsHumberBridgeGantries.aspx</link>
            <description>Eadon Consulting has recently teamed up with C Spencer Limited who have won a presitigious contract to install the dehumidification system to the main cables of the Humber Bridge.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsHumberBridgeGantries.aspx</guid>
            <pubDate>Fri, 12 Feb 2010 17:50:00 +0000</pubDate>
        </item>		  
		  <item>
            <title>Bristol Junction Lock Swing Bridge First Swing</title>
            <link>http://www.eadonconsulting.co.uk/NewsMachineryDirective.aspx</link>
            <description>Operating the systems manual hydraulic controls, the bridge was successfully slewed across the lock in creep speed for the first time since last October.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsJunctionLockSwingBridge.aspx</guid>
            <pubDate>Thu, 4 Feb 2010 10:45:00 +0000</pubDate>
        </item>
		  <item>
            <title>New Machinery Directive Comes Into Force</title>
            <link>http://www.eadonconsulting.co.uk/NewsMachineryDirective.aspx</link>
            <description>Many people still aren’t aware that the new Machinery Directive becomes applicable on the 29th December 2009. Eadon Consulting recently attended a workshop with the Health and Safety Laboratory at Buxton in Derbyshire to get up to speed on the new rules.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsMachineryDirective.aspx</guid>
            <pubDate>Mon, 21 Dec 2009 23:30:00 +0000</pubDate>
        </item>
		  <item>
            <title>Eadon Consulting To Get New Nuclear Neighbours</title>
            <link>http://www.eadonconsulting.co.uk/NewsNuclearResearchCentre.aspx</link>
            <description>It was announced today that the site for the new Nuclear Advanced Manufacturing Research Centre (NAMRC) will be in South Yorkshire and more specifically the Advanced Manufacturing Park, the location of Eadon Consulting’s offices.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsNuclearResearchCentre.aspx</guid>
            <pubDate>Thu, 3 Dec 2009 16:30:00 +0000</pubDate>
        </item>
		  <item>
            <title>Developing Nuclear Skills</title>
            <link>http://www.eadonconsulting.co.uk/NewsEadonNuclearSkills.aspx</link>
            <description>Following the UK government’s announcement at the beginning of the month about site approval for 10 new nuclear power stations, it is even more apparent how important this part of the energy sector is going to be. Just as important is keeping up to date with the relevant legislation and developing knowledge and skills within the nuclear industry. </description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsEadonNuclearSkills.aspx</guid>
            <pubDate>Tue, 17 Nov 2009 18:00:00 +0000</pubDate>
        </item>
		<item>
            <title>Eadon Consulting Move to Leading UK Technology Centre</title>
            <link>http://www.eadonconsulting.co.uk/NewsEadonNewPremises.aspx</link>
            <description>Due to continued growth and expansion, Eadon Consulting has moved to new larger premises at one of the country's leading technology centres. The move is part of an ongoing strategy that will facilitate future growth and development of the company.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsEadonNewPremises.aspx</guid>
            <pubDate>Wed, 16 Sep 2009 12:00:00 +0100</pubDate>
        </item>
        <item>
            <title>Eadon Design Access Platforms for Forth Road Bridge</title>
            <link>http://www.eadonconsulting.co.uk/NewsForthBridgeAccessPlatforms.aspx</link>
            <description>C. Spencer has recently taken delivery of the first of 14 aluminium access platforms for the Forth Road Bridge. The platforms were designed by Eadon Consulting in collaboration with C. Spencer. The platforms were designed in aluminium to minimise weight making their handling on site during installation easier and safer.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsForthBridgeAccessPlatforms.aspx</guid>
            <pubDate>Wed, 9 Sep 2009 12:00:00 +0100</pubDate>
        </item>
		<item>
            <title>Eadon Consulting Team Grows</title>
            <link>http://www.eadonconsulting.co.uk/NewsEadonTeamGrows.aspx</link>
            <description>Eadon Consulting has expanded their team with the appointment of Michael Thorogood as a Director. Mike is an expert on the design and installation of moveable bridges and structures, having worked on some of the most prestigious projects of this type in the UK.</description>
            <category>News</category>
            <guid isPermaLink="false">http://www.eadonconsulting.co.uk/NewsEadonTeamGrows.aspx</guid>
            <pubDate>Mon, 1 Jun 2009 12:00:00 +0100</pubDate>
        </item>
    </channel>
</rss>
