Cley Floodgates

TEMA Engineering won the contract to replace the existing Cley Floodgates. The design of the gates was fully developed by the client with the exception of the mounting for the hydraulic drive rams and the locking mechanism to hold the gate open (the two mechanical aspects of the automated gate).

TEMA Engineering appointed Eadon Consulting to produce the detailed design and supporting calculation pack for the ram mountings and the locking mechanisms. The ram mounts and locking mechanisms have been manufactured and the project is due for completion early October 2009.

For more information regarding our waterways & flood defence design services or to discuss your floodgate requirements, please telephone 0114 399 0400 or email us.

Key Facts
  • Location:
    Cley-next-the-sea, North Norfolk
  • Client:
    TEMA Engineering