Engineering Design Consultants
Oct282010
Es Suki stop logs and grapple beam
Es Suki stop logs and grapple beam

Eadon have recently completed the detailed design and analysis of a series of stop logs and associated grapple beam for stop log removal for a pumping station in the Sudan. 

 


Photo: Tema Engineering


Photo: Tema Engineering

For more information regarding our detailed design and analysis services or to discuss your requirements, please telephone 0114 399 0400 or email us.

Posted In: Waterways

< Back to News

Categories
Archives
Eadon on Twitter