Swansea Point Swingbridge, Swansea. Working for Quadrant Consulting as specialist subcontractor, carried out the preliminary design and submitted the structural and M&E AIP’s for a 30m long swing bridge.
Neath Canal Locks, Neath. Designed and project managed the contract for installing nine sets of traditional timber lock gates for the refurbishment of Neath Canal. Client – Neath Canal Trust.
City Mill Lock, London. Designed all the structural and mechanical equipment and project managed the contract for the installation of three sets of mechanised lock gates. Client – British Waterways.
Maud Foster Sluice, Boston. Working as Principle Contractor, managed the contract and designed three sets of timber flood defence gates for the refurbishment of the sluice structure. Client – Environment Agency.
Manual Swing bridges, Various. Design responsibility for the mechanical equipment and managed the projects to install four manual operation swing bridges. Client - British Waterways.
Lydney Harbour Regeneration, Lydney. The project was sponsored by English Heritage. Carried out detailed design for the structural and mechanical equipment for fully mechanised Sea Gates, Lock Gates and Flood Gates, as well as managing the whole project through to commissioning including subcontracting the electrical works. Client – Environment Agency.
Lydney Harbour Regeneration, Lydney. Worked as specialist sub-consultant to Babtie Brown & Root and provided the outline design and structural and M&E specification for the tender package for the project described above. Client – Environment Agency
New Islington Bascule Bridge, Manchester. Managed the project through manufacture to installation of the 10m pedestrian bascule bridge. Client - British Waterways
Deganwy Marina Tidal Gate, North Wales.The scheme consisted a 20m x 3.5m cill gate, operated by gate buoyancy. Carried out the design of the closed circuit pumping system and managed the structural, mechanical and electrical works. Client – Deganwy Quay Marina
St Andrews Bascule Bridge, St Andrews. This design and build project was for a hydraulically powered, timber, double leaf bascule bridge, spanning 10m. Carried out the structural and mechanical design and supervised the engineer managing the project. Client –British Waterways
Bradley Swing Bridge, North Yorkshire.The works consisted of an 18m single carriage fully automated swing bridge, including mechanical, electrical and hydraulic works. Responsible for the design of the mechanical equipment as well as the project management of the whole structural, mechanical, electrical and hydraulic package. Client – British Waterways
Bells and Glovers Swing Bridges, Ormskirk. The works consisted of two 13m single carriage swing bridges. Managed the mechanical, electrical and hydraulic works. Client – British Waterways
The Deep Millennium Project Footbridges, Hull. The works consisted of 135m of fully fabricated pedestrian bridge sections for which managed the contract. Client – Hull City Council
Goole Caisson, Goole. Design of steel fabricated canal breach protection gates with damping system and included full automation and CCTV for remote operation. Client – British Waterways
Brewery Swing Bridge, Skipton. The works consisted of a 12m single carriage semi-automated swing bridge, including mechanical, electrical and hydraulic works. Client – British Waterways
Grangemouth Lock, Falkirk. Designed all the equipment and managed the structural, mechanical, hydraulic and electrical works for a brand new fully automated lock gate system for the reopening of the Forth & Clyde Canal, Millennium Link Project. Client – British Waterways
Dalmuir Drop Lock, Clydebank. The scheme created the world’s first Drop Lock, an automated locking system for canal boats ‘crossing the road’. Designed all the structural and mechanical equipment and managed the structural, M&E and hydraulic works. Client – British Waterways
Conwy Marina Tidal Gate, Conwy. Similar to the Deganwy project described above. Designed the pumping system and worked closely with Robert West Consulting to overcome the teething problems on the first gate of its kind, using buoyancy for opening and closing. Client – Quay Marinas
Naburn Lock Mechanisation, York. Acted as principle contractor responsible for civil, mechanical, hydraulic and electrical works including design for the mechanisation of a listed lock structure.